Video Coming Soon
- Initial Exam
- Initial Setup
- Visit 1
- Visit 2
- Visit 3
- Visit 4
- Visit 5
- Visit 6
- Visit 7
- Visit 8
- Visit 9
- Visit 10
- Progress 12/29/16
- Progress 3/20/17
- Progress 5/19/17
- Visit 11
- Visit 12
- Visit 13
- Visit 14
- Visit 15/Debond Day
- Gingivectomie
- Final
Inital Exam
Chief Complaints
Doesn’t like spaces in the upper arch and lower alignment
Diagnosis
Class I R/l, Midline Centered, 2mm U-space, 2-3mm L-Crowding, Narrow Arches, U3’s Grown Flat, Gummy Smile
Treatment Options
Comprehensive treatment with U-Clear, L- Stainless Steel Brackets. Decided not to start with TAD’s. (Later on changed her mind)
Torque Selection
Month 3
Wire Progression
Upper: .018 Cu NiTi (Round)
Lower: .018 Cu NiTi (Round)
Auxilliaries
C-Chains: Add C-Chain at U L/R 6-6 (Closed, Under)
Month 4
Wire Progression
Upper: 14×25 Cu NiTi (Rectangular)
Lower: 14×25 Cu NiTi (Rectangular)
Auxiliaries
C-Chains: Remove C-Chain at 14-3 (Closed, Under)
Steel Ties: Add Steel Tie at U/L 3-3 (Braided)
Month 5
Wire Progression
Upper: 18×25 CuNiTi (Rectangular)
Lower: 18×25 CuNiTi (Rectangular)
Auxiliaries
C-Chains:Â Replace C-Chain at U/L 6-6 (Closed, Under)
Steel Ties:Â Remove Steel Tie at U 3-3 (Braided)
Month 8
Wire Progression
Upper: 14×25 Cu NiTi (Rectangular)
Lower: 14×25 Cu NiTi (Rectangular)
Auxiliaries
C-Chains: Remove C-Chain at 14-3 (Closed, Under)
Steel Ties: Add Steel Tie at U/L 3-3 (Braided)
Bracket Repositioning:
Brackets: Reposition Regular Torque Metal Bracket at LR 2; Update High Torque Clear Bracket at U R/L 2’s
Comments
Built up U 3’s, reshaped L3’s
Month 10
Wire Progression
Upper: 18×25 Cu NiTi (Rectangular)
Lower: 16×25 SS (Rectangular)
Brackets: Reposition High Torque Clear Bracket at UL 2-3; Rebond High Torque Clear Bracket at UL 3
Comments
Month 10
Wire Progression
Upper: 16×25 SS (Rectangular)
Lower: 16×25 SS (Rectangular)
C-Chains: Add C-Chain at L L/R 6-6 (Closed, Under)
Steel Ties: Remove Steel Tie at L L/R 3-3 (Braided)
Auxiliaries
C-Chains: Add C-Chain at L L/R 6-6 (Closed, Under)
Steel Ties: Remove Steel Tie at L L/R 3-3 (Braided)
Comments
Slenderized U/L 2-2
Month 10
Wire Progression
Upper: 16×25 SS (Rectangular)
Lower: 16×25 SS (Rectangular)
Wire Hooks:Â Add Wire Hook at UL2-UL3,UR3-UR2
C-Chains:Â Remove C-Chain at LL6-LR6,UL6-UR6 (Closed, Under)
Steel Ties:Â Add Steel Tie at LL3-LR3,UR3-UL3 (Figureeight, Under)
Retraction Springs:Â Add Retraction Spring at AWHook(L L 2-3)-TAD,AWHook(U L 4-5)-TAD (Short)
Bite Turbos:Â Add Bite Turbo at LL7,LR7
TADs:Â Add TAD at UR3-UR2,UL2-UL3 (Buccal)
Comments
- We started in .014 CuNi for 6 weeks and placed coil springs on the upper & lower 3’s back to the 6’s, activating them by 1/2 bracket’s length
- Used a light-medium titanium coil spring. only advancing the coil spring by 1/2 a bracket every 6 weeks.
- .018 for 6 weeks
- 14×25 rectangular wires for 6 weeks
Month 20
Wire Progression
Upper: 16×25 SS (Rectangular)
Lower: 16×25 SS (Rectangular)
Auxiliaries
Wire Hooks: Remove Wire Hook at UR3-UR2, UL2-UL3; Add Wire Hook at UR4-UR3, UL3-UL4, LL4-LL3, LL3-LL2, LR2-LR3, LR3-LR4
Elastic Bands: Add Moose at AWHook(UL3-UL4)-AWHook(LL2-LL3)-AWHook(LL3-LL4), AWHook(LR3-LR4)-AWHook(LR3-LR2)-AWHook(UR4-UR3) (Fulltime)
C-Chains: Add C-Chain at UR6-UL6 (Closed)
Steel Ties: Remove Steel Tie at UR3-UL3 (Figure Eight)
Retraction Springs: Remove Retraction Spring at AWHook(UR3-UR2)-TAD(UR3-UR2), AWHook(UL2-UL3)-TAD(UL2-UL3) (Short)
Comments
Placed sling U3-3
Month 21
Wire Progression
Upper: 16×25 SS (Rectangular)
Lower:Â 16×25 SS (Rectangular)
Auxiliaries
Bends:Add Bend at UR3 (Upper, BuccalStep)
Bracket Hooks:Â Add Bracket Hook at UR3,UL3,LL4,LR4
Elastic Bands:Â Remove All Elastic Band;Â Add 6-4-3 (Moose) (Fulltime, Both)
C-Chain:Â Changed C-Chain at UR6-UR6-UL6 (Closed)
TADs:Â Remove TAD at UR3-UR2,UL2-UL3 (Buccal)
Month 22
Wire Progression
Upper: 16×25 SS (Rectangular)
Lower:Â 16×25 SS (Rectangular)
Auxiliaries
Wire Hooks:Â Add Wire Hook at UR3-UR2,UL2-UL3
C-Chains:Â Remove C-Chain at UR6-UR6-UL6 (Closed);Â Add C-Chain at UR3-UL3 (Closed, Under)
Tie-Backs:Â Add Tie-Back at UR6-AWHook(UR3-UR2),AWHook(UL2-UL3)-UL6,AWHook(LL3-LL2)-LL6,LR6-AWHook(LR2-LR3) (Long)
IPRs:Â Add IPR at UR2-UR1,UR1-UL1,UL1-UL2 (Both, 0.1mm)
Month 23
Wire Progression
Upper: 16×25 SS (Rectangular)
Lower: 16×25 SS (Rectangular)
Auxiliaries
Bends: Add Bend at UR2-UL2 (Upper, ExtrusionStep); Add Bend at LL4,LR4 (Lower, IntrusionStep); Add Bend at UR2 (Upper, BuccalStep); Add Bend at UL2 (Upper, MesialIn)
C-Chains: Remove C-Chain at UR3-UL3 (Closed, Under); Add C-Chain at UR7-UL7 (Open, Under)
Tie-Backs: Remove Tie-Back at UR6-AWHook(UR3-UR2), AWHook(UL2-UL3)-UL6 (Long)